Four kinds of partner. One shared inefficiency.

Watt only works if the physical side is real. These are the counterparties that make it so, and what each one gets out of it.

TrakiaSolar

Solar park

A 45 MW solar park in Strandzha, Bulgaria, built on a reclaimed mine site. Utility-scale generation of exactly the kind whose midday output can exceed what the local grid absorbs. That is exactly the curtailment profile this protocol is designed around.

Who we're looking for

Generation

Sites with curtailment

If your site is instructed to throttle at midday, that shortfall is the product. We size a deployment to the curtailment profile and absorb it behind the meter. No grid upgrade, no export.
EPC

Engineering and construction

EPCs already know the curtailment numbers by region and have built the parks. Designing compute into a project from the start changes its break-even, and retrofits are possible on existing sites.
Demand

Compute buyers

Teams that need GPU hours, batch windows or cold storage, and would rather buy capacity backed by energy that would otherwise be discarded. Vouchers are transferable, so commitments are not stranded.
Operations

Hardware operators

Running racks inside a modular data centre at a generation site: commissioning, liquid cooling, uptime, and the attestations that settle redemptions on-chain.